Xiamen ZiYuan Energy Technology Co., Ltd

厦门子元能源科技有限公司
Tile Roof Hook mounting system
    Publish time 2021-03-25 14:41    
Tile Roof Hook mounting system
Brand ZIYUAN
Wind Speed
60m/s
Material
AL6005/T5 & SUS304 & SUS410
Snow Load
1.4KN/m²
Surface Coating
Anodizing
Warranty
10years
Design Code
JIS C 8955 2017
Service Life
25years
Standard
AS/NZS 1170



Tile Roof Hook mounting system is a common solution for ceramic tile and glazed tile rooftop, the main parts are Tile Roof Hook, Rail, Rail Connector, Mid Clamp and End Clamp. 



INSTALLATION STEPS


1.Lift the tiles and install the Tile Roof Hook on the roof purlin with the screws, then cover the tiles.     
2.Install the Rail on the Tile Roof Hook, lock the bolt tightly and make sure all Rails are in same level.
3.Install the solar panel on the Rails with the End Clamp and Mid Clamp, lock the bolt tightly.